SEVKAZENERGO JSC held annual public hearings on which thedirector of Petropavlovsk CHP-2 Victor Barmin made reports on the work of the station. He told the participants about the results of work in terms of heat production, about the transformations occurred at the station in 2018 and what the station is waiting for in the future.