• The best energy specialists work here!

  • The production of thermal and electric energy is provided by Pavlodar CHPP-2, CHPP-3, Petropavlovsk CHPP-2

  • 1,318 MW The total installed capacity

  • Total installed thermal capacity of the stations 2 949 Gcal/h

  • Total length of power transmission lines 48.4 thousand kilometers

  • Total length of thermal networks 627.2 kilometers

  • The wind farm «Astana EXPO-2017» consists of 29 generators with a total capacity of 100 MW

  • The main priority in all types of activities of the Corporation is the life and health of workers

  • High-tech Data Processing Center (DPC) of the Corporation in Pavlodar

География деятельности АО "ЦАЭК"

Subsidiaries