In 2016 Petropavlovsk Heat Networks LLP plans to replace 12.7 km of networks within the capital and current repairs. During a press tour for representatives of a state bodies, public and mass media of Petropavlovsk heat power engineers informed about upcoming repairs and familiarized with activities into which the tariff funds are invested.
Within the frames of preparation for the upcoming heating season Petropavlovsk Heat Networks LLP plans to invest 2.900 KZT bln to the development of district heating of Petropavlovsk. Among which 346.320 KZT mln - funds of investment (tariff) program, 343.170 KZT mln – funds from the repairs fund and2.200 KZT bln – borrowed funds allocated by the European Bank for Reconstruction and Development and the budgetary subsidy of the Ministry of National Economy.
"To a date, the annual plan of repairs is fulfilled by more than 60%. In addition to networks reconstruction, we carry out a rehabilitation of heat insulation with recovery of bare spots. It is planned to rehabilitate 4.800 km of heat insulation, as of the moment 4.104 km (85.5% of the annual plan) is recovered. Also in 2016 we have planned current repair of buildings of three heating units", - stated Igor Rybas, General Director of Petropavlovsk Heat Networks LLP.